Brevard County (the Space Coast) has seen a wave of aerospace, residential, and beachside construction tied to growth around Cape Canaveral and Melbourne. Serving Palm Bay, Melbourne, Titusville, and Rockledge, and the surrounding Brevard County communities. Florida law (Fla. Stat. § 713.13) requires a recorded Notice of Commencement for most direct contracts over $2,500 — recorded with the Brevard County Clerk of the Circuit Court in Titusville, and posted on the jobsite before the first inspection.
Notice of Commencement filings for Brevard County are recorded with the Brevard County Clerk of Court in Titusville. A certified copy must be posted at the jobsite before the first inspection.
Brevard County Clerk of Court website
Florida statutory recording fees are set by Fla. Stat. § 28.24 — typically $10.00 for the first page and $8.50 per additional page, with an extra fee per name indexed beyond four. Confirm current totals with the Brevard Clerk of Court before recording.
Brevard County includes 10 incorporated cities and towns — Palm Bay, Melbourne, Titusville, Rockledge, West Melbourne, Cocoa, Cocoa Beach, Satellite Beach, Cape Canaveral, and Indian Harbour Beach, among others. Wherever your project is — inside any of these city limits or in unincorporated Brevard County — the Notice of Commencement is recorded in one place: the Brevard County Clerk of Court in Titusville. City building departments may issue the permit and run inspections, but the NOC itself is always a county-level recording.
Florida Statute § 713.13 requires a property owner to record a Notice of Commencement before construction begins on most projects over $2,500. The NOC must include:
The recorded NOC protects the owner from paying twice if a subcontractor or supplier isn't paid by the general contractor. After recording with the Brevard Clerk of Court, the owner must:
Notices of Commencement for projects in Brevard County are recorded with the Brevard County Clerk of Court in Titusville. Most Florida clerks accept the same statewide § 713.13 form — recorded in person, by mail, or through the clerk's e-recording portal.
With the county. Brevard County includes 10 incorporated cities and towns — Palm Bay, Melbourne, Titusville, Rockledge, West Melbourne, Cocoa, Cocoa Beach, Satellite Beach, Cape Canaveral, and Indian Harbour Beach, among others. Wherever your project is — inside any of these city limits or in unincorporated Brevard County — the Notice of Commencement is recorded in one place: the Brevard County Clerk of Court in Titusville. City building departments may issue the permit and run inspections, but the NOC itself is always a county-level recording.
Florida law (Fla. Stat. § 713.13) requires the NOC to be recorded before the first inspection, and a certified copy must be posted on the jobsite. Recording an NOC after work begins can leave the owner exposed to paying twice for the same work.
Florida's Notice of Commencement is a statewide form defined by Fla. Stat. § 713.13. Every county clerk, including Brevard County, accepts that form, though clerks may have minor formatting preferences (margins, recording-stamp space). NOC Signatures generates a Florida-compliant NOC ready for the Brevard Clerk of Court.
Yes. Florida's Uniform Electronic Transaction Act (Fla. Stat. § 668.50) gives an e-signature the same legal effect as an ink signature for construction documents, including the Notice of Commencement. The signed PDF still must be notarized and recorded with the Brevard Clerk of Court before the first inspection.
A Notice of Intent to Lien (NOI) is the final demand a contractor or supplier serves on the owner — and any contractor or lender on the project — before recording a Claim of Lien with the Brevard County Clerk of Court. Florida does not require an NOI before recording a lien under Chapter 713, but most Florida contractors send one as a 10-day final demand because it frequently triggers payment and documents a good-faith effort to resolve the debt before filing.
There is no statutory minimum, but 10 days is the standard demand window used in Brevard County and statewide in Florida. After the window expires, the claimant may proceed to record a Claim of Lien with the Brevard County Clerk of Court — subject to Florida's 90-day-from-last-furnishing deadline under Fla. Stat. § 713.08.
NOC recording guides for the counties bordering Brevard County:
This page is general information about Florida law — not legal advice. For questions about your specific Brevard County project, consult a Florida construction attorney.