South Florida
Miami-Dade is Florida's most populous county and one of the country's largest construction markets — high-rise residential, commercial, and renovation projects all require properly recorded Notices of Commencement. Serving Miami, Hialeah, Miami Gardens, and Miami Beach, and the surrounding Miami-Dade County communities. Florida law (Fla. Stat. § 713.13) requires a recorded Notice of Commencement for most direct contracts over $2,500 — recorded with the Miami-Dade County Clerk of the Circuit Court in Miami, and posted on the jobsite before the first inspection.
Notice of Commencement filings for Miami-Dade County are recorded with the Miami-Dade County Clerk of Court in Miami. A certified copy must be posted at the jobsite before the first inspection.
Miami-Dade County Clerk of Court website
Florida statutory recording fees are set by Fla. Stat. § 28.24 — typically $10.00 for the first page and $8.50 per additional page, with an extra fee per name indexed beyond four. Confirm current totals with the Miami-Dade Clerk of Court before recording.
Miami-Dade County includes 10 incorporated cities and towns — Miami, Hialeah, Miami Gardens, Miami Beach, Homestead, Doral, North Miami, Coral Gables, Cutler Bay, and North Miami Beach, among others. Wherever your project is — inside any of these city limits or in unincorporated Miami-Dade County — the Notice of Commencement is recorded in one place: the Miami-Dade County Clerk of Court in Miami. City building departments may issue the permit and run inspections, but the NOC itself is always a county-level recording.
Florida Statute § 713.13 requires a property owner to record a Notice of Commencement before construction begins on most projects over $2,500. The NOC must include:
The recorded NOC protects the owner from paying twice if a subcontractor or supplier isn't paid by the general contractor. After recording with the Miami-Dade Clerk of Court, the owner must:
Notices of Commencement for projects in Miami-Dade County are recorded with the Miami-Dade County Clerk of Court in Miami. Most Florida clerks accept the same statewide § 713.13 form — recorded in person, by mail, or through the clerk's e-recording portal.
With the county. Miami-Dade County includes 10 incorporated cities and towns — Miami, Hialeah, Miami Gardens, Miami Beach, Homestead, Doral, North Miami, Coral Gables, Cutler Bay, and North Miami Beach, among others. Wherever your project is — inside any of these city limits or in unincorporated Miami-Dade County — the Notice of Commencement is recorded in one place: the Miami-Dade County Clerk of Court in Miami. City building departments may issue the permit and run inspections, but the NOC itself is always a county-level recording.
Florida law (Fla. Stat. § 713.13) requires the NOC to be recorded before the first inspection, and a certified copy must be posted on the jobsite. Recording an NOC after work begins can leave the owner exposed to paying twice for the same work.
Florida's Notice of Commencement is a statewide form defined by Fla. Stat. § 713.13. Every county clerk, including Miami-Dade County, accepts that form, though clerks may have minor formatting preferences (margins, recording-stamp space). NOC Signatures generates a Florida-compliant NOC ready for the Miami-Dade Clerk of Court.
Yes. Florida's Uniform Electronic Transaction Act (Fla. Stat. § 668.50) gives an e-signature the same legal effect as an ink signature for construction documents, including the Notice of Commencement. The signed PDF still must be notarized and recorded with the Miami-Dade Clerk of Court before the first inspection.
A Notice of Intent to Lien (NOI) is the final demand a contractor or supplier serves on the owner — and any contractor or lender on the project — before recording a Claim of Lien with the Miami-Dade County Clerk of Court. Florida does not require an NOI before recording a lien under Chapter 713, but most Florida contractors send one as a 10-day final demand because it frequently triggers payment and documents a good-faith effort to resolve the debt before filing.
There is no statutory minimum, but 10 days is the standard demand window used in Miami-Dade County and statewide in Florida. After the window expires, the claimant may proceed to record a Claim of Lien with the Miami-Dade County Clerk of Court — subject to Florida's 90-day-from-last-furnishing deadline under Fla. Stat. § 713.08.
NOC recording guides for the counties bordering Miami-Dade County:
This page is general information about Florida law — not legal advice. For questions about your specific Miami-Dade County project, consult a Florida construction attorney.